• Login / Join
  • About
  • •
  • Contact
  • •
  • Advertising
bustler logo
bustler logo
  • News
  • Competitions
  • Events
  • Bustler is powered by Archinect
  • Sign up for Bustler's Email Newsletters

  • Follow these Bustler feeds:

  • Search

    Search in

  • Submit

    What are you submitting?

    News Pitch
    Competition
    Event
  • Login / Join
  • News|Competitions|Events
  • Search
    | Submit
    | Follow
  • Search in

    What are you submitting?

    News Pitch
    Competition
    Event

    Follow these Bustler feeds:

  • About|Contact|Advertising
  • Login / Join

P.S.1 out of 7295 - BIG's Finalist Proposal

By Bustler Editors|

Monday, Feb 15, 2010

Previously on Bustler, we featured the winning design of the annual PS1 Young Architects Program, curated by The Museum of Modern Art and P.S.1 Contemporary Art Center.

Among the finalists was also the fascinating entry ‘P.S.1 out of 7295’ by Danish BIG - Bjarke Ingels Group:

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Finalist Proposal for P.S.1 2010 by BIG

The finalists were asked to present designs for temporary urban landscapes that incorporate elements of shade, water, seating, and bar areas for the expansive courtyard entrance of P.S.1. The competition program focused on designs which address sustainability, recycling, and reuse.

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Rendering of ‘P.S.1 out of 7295’

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Rendering of ‘P.S.1 out of 7295’

Here’s how BIG explain their concept:

How can you make something temporary sustainable?

Building something in order to tear it down three months later seems like the epitome of excess and wastefulness. BIG proposes a structure that creates maximum impact with a minimum of means, where human life unfolds to the fullest with minimum material expense. An installation that consists of 99.9% air is formed as a cloud-like landscape for playing, relaxing, and dancing that provides seating, playgrounds, water, shade and light. The P.S.1 installation is conceived as a three-month chapter in the cradle to cradle life-cycle design of the cloudscape. The fabric of the cloudscape is translucent recycled PVC, made from recycled truck bed covers and bags, reducing the environmental impact by 80% on average by eliminating the raw material extraction and production processes.

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Rendering of ‘P.S.1 out of 7295’

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Rendering of ‘P.S.1 out of 7295’

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Rendering of ‘P.S.1 out of 7295’

The cloudscape is continuous from the entrance to the courtyard, taking on three primary forms – a bubbly dune in the big rectangular courtyard, including a mega air mattress for play and physical activity and a paddling pool surrounded by bouncy seating; a three-dimensional cumulus landscape in the main courtyard with a covered chill out area of air mattresses and beanbags as well as a shaded bar for staff and guests; and a cluster of free floating cirrus clouds above the DJ and dance floor.

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Model Photo

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Model Photo

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Model Photo

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Model Photo

The cloudscape is composed of spheres of two different sizes made from a composition of identical triangulated S-shapes. After deflation at the end of the season, the S-shapes can be folded into Manhattan Portage Bags. Each bag is given a unique number that is printed on the fabric along with the pattern and folding instructions. After the season the bags can be sold as numbered fragments of the total piece - P.S.1 out of 7295.

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Site Plan

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Concept Diagram

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Concept Diagram

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Concept Diagram

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Concept Diagram

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Concept Diagram

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Concept Diagram

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Concept Diagram

Project Details:
PROJECT: P.S.1 OUT OF 7295
CLIENT: P.S.1 MoMA
SIZE: 1,550 M2
LOCATION: LONG ISLAND CITY, NEW YORK / USA
PS1 CREDIT LIST
Partner-in-Charge: Bjarke Ingels
Project Leader: Jakob Henke
Contributors: Daniel Sundlin, Aleksander Tokarz, Alysen Hiller, Xi Chen

Images: BIG

Related

usa ● temporary ● ps1 ● p.s.1 ● new york ● moma ● installation ● denmark ● brooklyn ● bjarke ingels group ● big ● art

Share

  • Follow

    0 Comments

  • Comment as :

P.S.1 out of 7295 - BIG's Finalist Proposal

New architecture and design competitions: Brick in Architecture Awards, Study Architecture Student Showcase, N.Y.C. Groceries, and New York High Falls Riverfront Market

SmithGroup’s ‘pioneering’ Philip Merrill Environmental Center wins AIA Twenty-five Year Award

Sponsored Post by Buildner

Museum of Emotions / Edition #8 FINAL registration deadline is in 5 DAYS!

Here are the winners of the 2026 AIA Architecture Awards

40 emerging architects and designers under 40 from Europe honored

Northwestern University selects 12-firm longlist to design new engineering building

New architecture and design competitions: Exploring 130 Years of American Design, Christo & Jeanne-Claude Center, 13 White Houses, and La Pyramide

Micro-architecture honored in latest Tiny House Architecture Competition

Sign up for Bustler's Email Newsletters

World’s most beautiful restaurants of 2026 chosen by Prix Versailles

Sponsored Post by Buildner

Design a wine tasting room in Italy! Valli Wine Tasting Room is launched!

10 can't-miss architecture & design events to see this June in London, Los Angeles, Chicago, San Francisco, Detroit, San Diego, Porto, and Barcelona

Sponsored Post by Buildner

Museum of Emotions / Edition #8 FINAL registration deadline is approaching!

Seven global projects make AR Public Awards shortlist 2026

Sponsored Post by Buildner

Design a slow-living restaurant in Portugal! Portugal Long Table Restaurant is launched!

World's best tall buildings honored at the CVU 2026 Award of Excellence

Next page » Loading

P.S.1 out of 7295 - BIG's Finalist Proposal

By Bustler Editors|

Monday, Feb 15, 2010

Share

Related

usa ● temporary ● ps1 ● p.s.1 ● new york ● moma ● installation ● denmark ● brooklyn ● bjarke ingels group ● big ● art

Previously on Bustler, we featured the winning design of the annual PS1 Young Architects Program, curated by The Museum of Modern Art and P.S.1 Contemporary Art Center.

Among the finalists was also the fascinating entry ‘P.S.1 out of 7295’ by Danish BIG - Bjarke Ingels Group:

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Finalist Proposal for P.S.1 2010 by BIG

The finalists were asked to present designs for temporary urban landscapes that incorporate elements of shade, water, seating, and bar areas for the expansive courtyard entrance of P.S.1. The competition program focused on designs which address sustainability, recycling, and reuse.

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Rendering of ‘P.S.1 out of 7295’

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Rendering of ‘P.S.1 out of 7295’

Here’s how BIG explain their concept:

How can you make something temporary sustainable?

Building something in order to tear it down three months later seems like the epitome of excess and wastefulness. BIG proposes a structure that creates maximum impact with a minimum of means, where human life unfolds to the fullest with minimum material expense. An installation that consists of 99.9% air is formed as a cloud-like landscape for playing, relaxing, and dancing that provides seating, playgrounds, water, shade and light. The P.S.1 installation is conceived as a three-month chapter in the cradle to cradle life-cycle design of the cloudscape. The fabric of the cloudscape is translucent recycled PVC, made from recycled truck bed covers and bags, reducing the environmental impact by 80% on average by eliminating the raw material extraction and production processes.

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Rendering of ‘P.S.1 out of 7295’

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Rendering of ‘P.S.1 out of 7295’

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Rendering of ‘P.S.1 out of 7295’

The cloudscape is continuous from the entrance to the courtyard, taking on three primary forms – a bubbly dune in the big rectangular courtyard, including a mega air mattress for play and physical activity and a paddling pool surrounded by bouncy seating; a three-dimensional cumulus landscape in the main courtyard with a covered chill out area of air mattresses and beanbags as well as a shaded bar for staff and guests; and a cluster of free floating cirrus clouds above the DJ and dance floor.

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Model Photo

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Model Photo

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Model Photo

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Model Photo

The cloudscape is composed of spheres of two different sizes made from a composition of identical triangulated S-shapes. After deflation at the end of the season, the S-shapes can be folded into Manhattan Portage Bags. Each bag is given a unique number that is printed on the fabric along with the pattern and folding instructions. After the season the bags can be sold as numbered fragments of the total piece - P.S.1 out of 7295.

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Site Plan

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Concept Diagram

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Concept Diagram

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Concept Diagram

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Concept Diagram

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Concept Diagram

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Concept Diagram

Finalist Proposal for P.S.1 2010 by BIG

Click above image to enlarge
Concept Diagram

Project Details:
PROJECT: P.S.1 OUT OF 7295
CLIENT: P.S.1 MoMA
SIZE: 1,550 M2
LOCATION: LONG ISLAND CITY, NEW YORK / USA
PS1 CREDIT LIST
Partner-in-Charge: Bjarke Ingels
Project Leader: Jakob Henke
Contributors: Daniel Sundlin, Aleksander Tokarz, Alysen Hiller, Xi Chen

Images: BIG

Share

  • Follow

    0 Comments

  • Comment as :

Archinect JobsArchinect Jobs

The Archinect Job Board attracts the world's top architectural design talents.

VIEW ALL JOBS POST A JOB

Project Designer / Manager

BuiltIN Studio

Project Designer / Manager

New York, NY, US

AutoCAD Drafter/Architectural Designer

Kari Whitman Interiors

AutoCAD Drafter/Architectural Designer

Boulder, CO, US

Professor/Associate Professor/Assistant Professor of Architecture

Harvard University

Professor/Associate Professor/Assistant Professor of Architecture

Cambridge, MA, US

Architect / Architectural Designer (3-5 years experience)

Resolution: 4 Architecture

Architect / Architectural Designer (3-5 years experience)

New York, NY, US

Architectural Designer Level 2

Arthur Chabon Architect

Architectural Designer Level 2

New York, NY, US

Architectural Designer

Build Block Inc.

Architectural Designer

Los Angeles, CA, US

Senior Designer - Residential Design

Laura U Design Collective

Senior Designer - Residential Design

Houston, TX, US

Project Manager / Project Architect (5–10 Years’ Experience)

Millan Architect / Studio Inc.

Project Manager / Project Architect (5–10 Years’ Experience)

Venice, CA, US

Project Architect

Pickard Architects

Project Architect

Whittier, CA, US

Project Manager/architect

MKNH Architects

Project Manager/architect

New York, NY, US

Next page » Loading