• Login / Join
  • About
  • •
  • Contact
  • •
  • Advertising
bustler logo
bustler logo
  • News
  • Competitions
  • Events
  • Bustler is powered by Archinect
  • Sign up for Bustler's Email Newsletters

  • Follow these Bustler feeds:

  • Search

    Search in

  • Submit

    What are you submitting?

    News Pitch
    Competition
    Event
  • Login / Join
  • News|Competitions|Events
  • Search
    | Submit
    | Follow
  • Search in

    What are you submitting?

    News Pitch
    Competition
    Event

    Follow these Bustler feeds:

  • About|Contact|Advertising
  • Login / Join

Harpa Reykjavik Concert Hall and Conference Center to Open in May 2011

By Bustler Editors|

Friday, Jul 2, 2010

Harpa Exterior (© 2007 Portus ehf., Olafur Eliasson, and Henning Larsen Architects)

Pétur J. Eiríksson, Chairman of Portus, announced earlier this week that the official opening and opening concert by the Iceland Symphony Orchestra at Harpa, Reykjavík’s new Concert Hall and Conference Centre, would take place on May 4, 2011. The opening concert will be conducted by Vladimir Ashkenazy. On May 14, 2011, Harpa will stage a grand opening program featuring a diverse range of music events and many of Iceland’s most prominent musicians. This program will be broadcast live on Icelandic National television.

Designed by Henning Larsen Architects with acoustics by Artec Consultants Inc and a façade by Olafur Eliasson in collaboration with the architects, Harpa is to become home to the Iceland Symphony Orchestra and the Icelandic Opera, and thus a major addition to the Icelandic and European cultural scene. It will also serve as a tourism and business hub, providing flexible facilities for programs and international events. The façade was designed by Olafur Eliasson in collaboration with Henning Larsen Architects. With acoustics conceived by Artec Consultants Inc, one of the most reputable experts in the field, and equipped with the most technologically advanced sound, staging and presentation systems also designed by Artec, the 28,000 square-meter (301,000 square-feet) complex will be a striking landmark in the redevelopment of the historic harbour and waterfront area, and a symbol of the country’s renewed dynamism. Henning Larsen Architects also consulted with Batteríið Architects to conceive the building. The main contractor is ÍAV.

Exterior (© 2007 Portus ehf., Olafur Eliasson, and Henning Larsen Architects)

"It is with great anticipation that we have seen the building and its magnificent façade emerge on the skyline," remarked Eiríksson. "Now that it is nearing completion, we can feel the energy it will bring to the city and how it will strengthen Reykjavík as one of the most attractive capitals in Europe."

Interior (© 2007 Portus ehf., Olafur Eliasson, and Henning Larsen Architects)

Harpa is expected to become a hub in the city’s vibrant music scene and to attract an audience of culture, architecture, and art enthusiasts as well as major international business and trade events. Based on a cooperative model, it will allow for a mix of large conventions, receptions, concerts, exhibitions and public programs that can all happen simultaneously. It will also be home to restaurants with direct views across the harbour.
 

Concert Hall (© 2007 Portus ehf., Olafur Eliasson, and Henning Larsen Architects)

The opening artistic program will be announced in the autumn of 2010 and will offer a diverse range of performances, from classical to contemporary. It is being developed under the guidance of artistic adviser Vladimir Ashkenazy and international consultant Jasper Parrott. Harpa is run by Portus and Ago, administrative structures which respectively own and operate the building and its programs. Pétur J. Eiríksson is the Chairman of Portus and Thorunn Sigurdardottir, the former Director of the Reykjavík Arts Festival, is the Chairman of Ago. Managing Director for both companies is Hoskuldur Asgeirsson. Portus and Ago are owned by the Icelandic state and the City of Reykjavik through holding company East Harbour.

4th Hall (© 2007 Portus ehf., Olafur Eliasson, and Henning Larsen Architects)

Harpa’s name comes both from the name of the string instrument and the ancient Icelandic name of a month in the old Nordic calendar, which marks the beginning of summer, a period of particular importance in Iceland.

Harpa’s logo was designed by The Icelandic Ad Agency and consists of a ring of outstretched tuning forks. It finds its roots in a classic and universal symbol of music arranged in a way that also resembles the sun or a snowflake. The circular arrangement calls to mind people coming together and represent the 12 months of the year, while the forks’ colours symbolize the colours of the different halls.

Northern Facade (© Osbjørn Jacobsen)

The Building:
Located on the harbour between the city centre and the North Atlantic Ocean, Harpa will become one of the city’s defining landmarks. According to Henning Larsen Architects, "the inner structure of the building shapes its key functions. Seen from the foyer, the halls form a massif with the Main Concert Hall as its red-­-glowing centre. This inner massif contrasts the expressive and open façades, thereby generating a dialogue that defines Harpa’s public space, continued in the square in front of the building. This will be realised in dark shades to juxtapose the crystalline exterior. The surroundings are thus incorporated into the architectural concept. As Harpa takes its beginning long before visitors step into the foyer, the activities of this cultural institution are merged with city life."

Facade Close-up (© 2007 Portus ehf., Olafur Eliasson, and Henning Larsen Architects)

The Façade:
The multi-faceted glass façade by artist Olafur Eliasson in collaboration with the architects is based on a geometric principle, realised in two and three dimensions. Reminiscent of the crystallised basalt columns commonly found in Iceland, the southern façade create kaleidoscopic reflections of the city and the striking surrounding landscape. Natural light is a key element, dramatically altering the transparency, reflectivity, and colours of the facades as the weather and seasons change. The quasi bricks of the south facades contain LED lights in different hues that make Harpa glow long after the sun has set. The brightness and colour of each module can be controlled and adjusted as needed. The assemblage of the façade is already under way and will be completed in late summer 2010.

Longitudinal Section (© Henning Larsen Architects)

The Facilities:
Throughout the design process, emphasis has been placed on giving Harpa enough versatility to host large and intimate events simultaneously and without interference with one another. Harpa’s facilities, which offer some of the most technologically advanced equipment available, are thus capable of accommodating everything from large conventions, concerts, and exhibitions to smaller banquets and meetings.

Floor Plan - Level 2 (© Henning Larsen Architects)

With acoustics design and technical facility planning provided by the world renowned Artec Consultants Inc, designers of the Jazz at Lincoln Center space, the Bartók Béla National Concert Hall in Budapest, Sala São Paulo and the Culture and Congress Center in Lucerne, Switzerland, Harpa will join the ranks of the most prestigious international concert halls in the world, as a prominent member of Artec’s family of halls. In addition to hosting an array of international music events, Harpa will also become home to the esteemed Iceland Symphony Orchestra and Icelandic Opera, both known for their professional artistic programs. Reykjavik has been waiting for decades for this new hall and its addition to the city´s energetic musical life.

The main concert hall, the largest of four in the Centre, is capable of accommodating up to 1,800 people. A spacious entrance hall is located on both the first and second levels and is the ideal space for exhibitions, large banquets, and receptions. There are two meeting halls on the first level as well as various smaller meeting rooms. Additional amenities include boutiques, a viewing balcony, a bar and restaurant with direct views across the harbour, a ground-­-floor bistro, catering, and underground parking options.

Related

reykjavik ● opera ● iceland ● harpa ● europe ● culture ● completition ● civic

Share

  • Follow

    0 Comments

  • Comment as :

Harpa Reykjavik Concert Hall and Conference Center to Open in May 2011

New architecture and design competitions: IDEAS Awards, UIA-HYP CUP International Student Competition, Vancouver Tall Challenge, and Memorial to the Sixth Extinction

Best small projects chosen at AIA Small Project Award 2026

10 standout sustainable projects honored at AIA COTE Top Ten Award 2026

Best residential architecture of 2026 honored at AIA Housing Award

Best new interiors of 2026 chosen at AIA Interior Architecture Awards

Best global architecture honored at RIBA International Awards 2026

World’s most beautiful airports of 2026 chosen by Prix Versailles

New architecture and design competitions: Brick in Architecture Awards, Study Architecture Student Showcase, N.Y.C. Groceries, and New York High Falls Riverfront Market

Sign up for Bustler's Email Newsletters

SmithGroup’s ‘pioneering’ Philip Merrill Environmental Center wins AIA Twenty-five Year Award

Sponsored Post by Buildner

Museum of Emotions / Edition #8 FINAL registration deadline is in 5 DAYS!

Here are the winners of the 2026 AIA Architecture Awards

40 emerging architects and designers under 40 from Europe honored

Northwestern University selects 12-firm longlist to design new engineering building

New architecture and design competitions: Exploring 130 Years of American Design, Christo & Jeanne-Claude Center, 13 White Houses, and La Pyramide

Micro-architecture honored in latest Tiny House Architecture Competition

Next page » Loading

Harpa Reykjavik Concert Hall and Conference Center to Open in May 2011

By Bustler Editors|

Friday, Jul 2, 2010

Share

Harpa Exterior (© 2007 Portus ehf., Olafur Eliasson, and Henning Larsen Architects)

Related

reykjavik ● opera ● iceland ● harpa ● europe ● culture ● completition ● civic

Pétur J. Eiríksson, Chairman of Portus, announced earlier this week that the official opening and opening concert by the Iceland Symphony Orchestra at Harpa, Reykjavík’s new Concert Hall and Conference Centre, would take place on May 4, 2011. The opening concert will be conducted by Vladimir Ashkenazy. On May 14, 2011, Harpa will stage a grand opening program featuring a diverse range of music events and many of Iceland’s most prominent musicians. This program will be broadcast live on Icelandic National television.

Designed by Henning Larsen Architects with acoustics by Artec Consultants Inc and a façade by Olafur Eliasson in collaboration with the architects, Harpa is to become home to the Iceland Symphony Orchestra and the Icelandic Opera, and thus a major addition to the Icelandic and European cultural scene. It will also serve as a tourism and business hub, providing flexible facilities for programs and international events. The façade was designed by Olafur Eliasson in collaboration with Henning Larsen Architects. With acoustics conceived by Artec Consultants Inc, one of the most reputable experts in the field, and equipped with the most technologically advanced sound, staging and presentation systems also designed by Artec, the 28,000 square-meter (301,000 square-feet) complex will be a striking landmark in the redevelopment of the historic harbour and waterfront area, and a symbol of the country’s renewed dynamism. Henning Larsen Architects also consulted with Batteríið Architects to conceive the building. The main contractor is ÍAV.

Exterior (© 2007 Portus ehf., Olafur Eliasson, and Henning Larsen Architects)

"It is with great anticipation that we have seen the building and its magnificent façade emerge on the skyline," remarked Eiríksson. "Now that it is nearing completion, we can feel the energy it will bring to the city and how it will strengthen Reykjavík as one of the most attractive capitals in Europe."

Interior (© 2007 Portus ehf., Olafur Eliasson, and Henning Larsen Architects)

Harpa is expected to become a hub in the city’s vibrant music scene and to attract an audience of culture, architecture, and art enthusiasts as well as major international business and trade events. Based on a cooperative model, it will allow for a mix of large conventions, receptions, concerts, exhibitions and public programs that can all happen simultaneously. It will also be home to restaurants with direct views across the harbour.
 

Concert Hall (© 2007 Portus ehf., Olafur Eliasson, and Henning Larsen Architects)

The opening artistic program will be announced in the autumn of 2010 and will offer a diverse range of performances, from classical to contemporary. It is being developed under the guidance of artistic adviser Vladimir Ashkenazy and international consultant Jasper Parrott. Harpa is run by Portus and Ago, administrative structures which respectively own and operate the building and its programs. Pétur J. Eiríksson is the Chairman of Portus and Thorunn Sigurdardottir, the former Director of the Reykjavík Arts Festival, is the Chairman of Ago. Managing Director for both companies is Hoskuldur Asgeirsson. Portus and Ago are owned by the Icelandic state and the City of Reykjavik through holding company East Harbour.

4th Hall (© 2007 Portus ehf., Olafur Eliasson, and Henning Larsen Architects)

Harpa’s name comes both from the name of the string instrument and the ancient Icelandic name of a month in the old Nordic calendar, which marks the beginning of summer, a period of particular importance in Iceland.

Harpa’s logo was designed by The Icelandic Ad Agency and consists of a ring of outstretched tuning forks. It finds its roots in a classic and universal symbol of music arranged in a way that also resembles the sun or a snowflake. The circular arrangement calls to mind people coming together and represent the 12 months of the year, while the forks’ colours symbolize the colours of the different halls.

Northern Facade (© Osbjørn Jacobsen)

The Building:
Located on the harbour between the city centre and the North Atlantic Ocean, Harpa will become one of the city’s defining landmarks. According to Henning Larsen Architects, "the inner structure of the building shapes its key functions. Seen from the foyer, the halls form a massif with the Main Concert Hall as its red-­-glowing centre. This inner massif contrasts the expressive and open façades, thereby generating a dialogue that defines Harpa’s public space, continued in the square in front of the building. This will be realised in dark shades to juxtapose the crystalline exterior. The surroundings are thus incorporated into the architectural concept. As Harpa takes its beginning long before visitors step into the foyer, the activities of this cultural institution are merged with city life."

Facade Close-up (© 2007 Portus ehf., Olafur Eliasson, and Henning Larsen Architects)

The Façade:
The multi-faceted glass façade by artist Olafur Eliasson in collaboration with the architects is based on a geometric principle, realised in two and three dimensions. Reminiscent of the crystallised basalt columns commonly found in Iceland, the southern façade create kaleidoscopic reflections of the city and the striking surrounding landscape. Natural light is a key element, dramatically altering the transparency, reflectivity, and colours of the facades as the weather and seasons change. The quasi bricks of the south facades contain LED lights in different hues that make Harpa glow long after the sun has set. The brightness and colour of each module can be controlled and adjusted as needed. The assemblage of the façade is already under way and will be completed in late summer 2010.

Longitudinal Section (© Henning Larsen Architects)

The Facilities:
Throughout the design process, emphasis has been placed on giving Harpa enough versatility to host large and intimate events simultaneously and without interference with one another. Harpa’s facilities, which offer some of the most technologically advanced equipment available, are thus capable of accommodating everything from large conventions, concerts, and exhibitions to smaller banquets and meetings.

Floor Plan - Level 2 (© Henning Larsen Architects)

With acoustics design and technical facility planning provided by the world renowned Artec Consultants Inc, designers of the Jazz at Lincoln Center space, the Bartók Béla National Concert Hall in Budapest, Sala São Paulo and the Culture and Congress Center in Lucerne, Switzerland, Harpa will join the ranks of the most prestigious international concert halls in the world, as a prominent member of Artec’s family of halls. In addition to hosting an array of international music events, Harpa will also become home to the esteemed Iceland Symphony Orchestra and Icelandic Opera, both known for their professional artistic programs. Reykjavik has been waiting for decades for this new hall and its addition to the city´s energetic musical life.

The main concert hall, the largest of four in the Centre, is capable of accommodating up to 1,800 people. A spacious entrance hall is located on both the first and second levels and is the ideal space for exhibitions, large banquets, and receptions. There are two meeting halls on the first level as well as various smaller meeting rooms. Additional amenities include boutiques, a viewing balcony, a bar and restaurant with direct views across the harbour, a ground-­-floor bistro, catering, and underground parking options.

Share

  • Follow

    0 Comments

  • Comment as :

Archinect JobsArchinect Jobs

The Archinect Job Board attracts the world's top architectural design talents.

VIEW ALL JOBS POST A JOB

Design Director or Sr. Architect

b.hills architecture, P.C.

Design Director or Sr. Architect

Boise, ID, US

Project Architect

The American Housing Corporation

Project Architect

Austin, TX, US

Project Architect

Fowlkes Studio

Project Architect

Washington, DC, US

Landscape Architect

EDR - Environmental Design & Research

Landscape Architect

Syracuse, NY, US

Designer (Level 3)

KPMB

Designer (Level 3)

Cambridge, MA, US

Project Captain

Practice (formerly GGA+)

Project Captain

Pasadena, CA, US

Project Architect

The Goldman Group

Project Architect

Walpole, MA, US

Architectural Designer

7th Street Burger

Architectural Designer

New York, NY, US

Design Technologist / BIM Lead

The American Housing Corporation

Design Technologist / BIM Lead

Austin, TX, US

Marketing & Business Development Manager

KPB Architects

Marketing & Business Development Manager

Anchorage, AK, US

Next page » Loading