• Login / Join
  • About
  • •
  • Contact
  • •
  • Advertising
bustler logo
bustler logo
  • News
  • Competitions
  • Events
  • Bustler is powered by Archinect
  • Sign up for Bustler's Email Newsletters

  • Follow these Bustler feeds:

  • Search

    Search in

  • Submit

    What are you submitting?

    News Pitch
    Competition
    Event
  • Login / Join
  • News|Competitions|Events
  • Search
    | Submit
    | Follow
  • Search in

    What are you submitting?

    News Pitch
    Competition
    Event

    Follow these Bustler feeds:

  • About|Contact|Advertising
  • Login / Join

UNStudio completes their first Belgium-based project, "Le Toison d'Or"

By Bustler Editors|

Friday, Jan 22, 2016

Photo: Hufton + Crow and Eva Bloem.

"Le Toison d'Or" is UNStudio's first project to be built on Belgian soil. Designed in collaboration with Belgian architecture firm Jaspers-Eyers Architects, the Brussels-based project first began in 2009 and was successfully realized just this month.

Showing off a distinctive exterior — from the fan-like forms facing the streets to the horizontally oriented facade that face the inner courtyard — the mixed use building consists of 72 residential apartments, 13,000 m2 of commercial space, parking, and a nearly 3,000 m2 elevated city garden.

UNStudio shared the details of the building right below.

Project description:

"Designed for ProWinko and in collaboration with Belgian architects Jaspers-Eyers, Le Toison d’Or is a hybridisation of a traditional building-block typology and a mixed-use development with a retail podium. Located on the Avenue de la Toison d'Or between two historical gates (the Porte Louise and the Port de Namur), the mixed-use complex integrates into the urban fabric of its surroundings, whilst simultaneously merging a retail and residential programme."

Photo: Hufton + Crow and Eva Bloem.

"Le Toison d'Or contains 72 apartments (from 50 to 750 m2), 13,000 m2 of commercial space, a 1040 m2 crèche, 330 parking spaces and an elevated city garden of 2,950 m2. In order to avoid the monolithic qualities common to block structures, the façade of Le Toison d’Or is broken up by means of variations in texture, depth and the repeating rhythm of a series of curved vertical frames. These frames serve to enclose the balconies of the apartments on the upper floors, whilst also facilitating the large display windows of the retail units."

Photo: Hufton + Crow and Eva Bloem.

"'It was important that the retail units be as open and light and possible. We wanted to contrast this with the apparent solidity of the upper floors, to create the illusion that the vertical balloon-like frames were carrying the building; as if the whole block almost has the potential float above the avenue,'" Ben van Berkel stated. "'In architecture we tend to favour abstraction and to avoid figuration. But on the street facade of the Toison d’Or building we wanted to investigate the space between the abstract and the figurative, to create moments of tacit allusion to the pictorial.'"

Photo: Hufton + Crow and Eva Bloem.

"In contrast to the vertical articulation of the street facade, the facades surrounding the elevated courtyard garden follow a horizontal arrangement. Here generously proportioned balconies provide a more tranquil experience of city life. To access the apartments visitors and residents enter the building from the street side, where a large sculptural staircase leads them up to the main reception lobby, which is located towards the rear and elevated above the two retail levels. From here they can continue to further lobby areas furnished with informal seating, where the elevators to the apartments are also located."

Photo: Hufton + Crow and Eva Bloem.

"The apartments in Le Toison d’Or vary in size from small to large, enabling a varied demographic of city residents. To ensure high levels of daylight in the interiors, the floor to ceiling heights reach at least 2.7 meters in living areas."

Photo: Hufton + Crow and Eva Bloem.

"For the apartments situated along the Avenue de la Toison d’Or, this height increases to more than 3 meters. Open kitchens in the form of large furniture elements create an informal entertaining space in the heart of the apartments and determine the circulation through the spaces."

Photo: Hufton + Crow and Eva Bloem.

"Le Toison d’Or has been developed with high standards of sustainability. Main features are the excellent thermic isolation of the façade (including triple glazing), a high standard of acoustic insulation, an inventive cogeneration installation system for both the apartments and the retail units and the use of glass-fiber reinforced concrete."

Photo: Hufton + Crow and Eva Bloem.

Project details:

Le Toison d’Or, Brussels, Belgium, 2009 - 2016
Client: TD Immo Invest BVBA, Brussels
Location: Avenue de la Toison d’Or25-29, Brussels
Building surface: 48000 m2
Building volume: 87000 m3 (above ground), 110.000 m3 (underground); total 197.000 m3
Building site: 5800 m2
Programme: Retail, apartments and underground parking
Status: Completed

More project images in the gallery below.

All images courtesy of UNStudio.

Related

unstudio ● retail ● residential ● mixed use ● brussels ● ben van berkel ● belgium

Share

  • Follow

    0 Comments

  • Comment as :

UNStudio completes their first Belgium-based project, "Le Toison d'Or"

Micro-architecture honored in latest Tiny House Architecture Competition

World’s most beautiful restaurants of 2026 chosen by Prix Versailles

Sponsored Post by Buildner

Design a wine tasting room in Italy! Valli Wine Tasting Room is launched!

10 can't-miss architecture & design events to see this June in London, Los Angeles, Chicago, San Francisco, Detroit, San Diego, Porto, and Barcelona

Sponsored Post by Buildner

Museum of Emotions / Edition #8 FINAL registration deadline is approaching!

Seven global projects make AR Public Awards shortlist 2026

Sponsored Post by Buildner

Design a slow-living restaurant in Portugal! Portugal Long Table Restaurant is launched!

World's best tall buildings honored at the CVU 2026 Award of Excellence

Sign up for Bustler's Email Newsletters

Sponsored Post by TWOPAGES

Final call: TWOPAGES X Design Contest 2026 submissions close June 5

Kengo Kuma & Paul Raff win Alberta national park visitor center competition with landscape-focused design

2026 Moira Gemmill and MJ Long prizes announced by W Awards

New architecture and design competitions: Kinderspace, Stewardson Keefe LeBrun Travel Grant, SMALL PROJECT BIG IMPACT, and Garden of University House, Bucharest

The Century of Gehry: New retrospective explores the late architect's work & collaborations

Sponsored Post by Buildner

Rome Rain Rooms FINAL registration deadline is in 5 DAYS!

UIA and UN Habitat unveil sustainability-focused winners for UIA 2030 Award

Next page » Loading

UNStudio completes their first Belgium-based project, "Le Toison d'Or"

By Bustler Editors|

Friday, Jan 22, 2016

Share

Photo: Hufton + Crow and Eva Bloem.

Related

unstudio ● retail ● residential ● mixed use ● brussels ● ben van berkel ● belgium

"Le Toison d'Or" is UNStudio's first project to be built on Belgian soil. Designed in collaboration with Belgian architecture firm Jaspers-Eyers Architects, the Brussels-based project first began in 2009 and was successfully realized just this month.

Showing off a distinctive exterior — from the fan-like forms facing the streets to the horizontally oriented facade that face the inner courtyard — the mixed use building consists of 72 residential apartments, 13,000 m2 of commercial space, parking, and a nearly 3,000 m2 elevated city garden.

UNStudio shared the details of the building right below.

Project description:

"Designed for ProWinko and in collaboration with Belgian architects Jaspers-Eyers, Le Toison d’Or is a hybridisation of a traditional building-block typology and a mixed-use development with a retail podium. Located on the Avenue de la Toison d'Or between two historical gates (the Porte Louise and the Port de Namur), the mixed-use complex integrates into the urban fabric of its surroundings, whilst simultaneously merging a retail and residential programme."

Photo: Hufton + Crow and Eva Bloem.

"Le Toison d'Or contains 72 apartments (from 50 to 750 m2), 13,000 m2 of commercial space, a 1040 m2 crèche, 330 parking spaces and an elevated city garden of 2,950 m2. In order to avoid the monolithic qualities common to block structures, the façade of Le Toison d’Or is broken up by means of variations in texture, depth and the repeating rhythm of a series of curved vertical frames. These frames serve to enclose the balconies of the apartments on the upper floors, whilst also facilitating the large display windows of the retail units."

Photo: Hufton + Crow and Eva Bloem.

"'It was important that the retail units be as open and light and possible. We wanted to contrast this with the apparent solidity of the upper floors, to create the illusion that the vertical balloon-like frames were carrying the building; as if the whole block almost has the potential float above the avenue,'" Ben van Berkel stated. "'In architecture we tend to favour abstraction and to avoid figuration. But on the street facade of the Toison d’Or building we wanted to investigate the space between the abstract and the figurative, to create moments of tacit allusion to the pictorial.'"

Photo: Hufton + Crow and Eva Bloem.

"In contrast to the vertical articulation of the street facade, the facades surrounding the elevated courtyard garden follow a horizontal arrangement. Here generously proportioned balconies provide a more tranquil experience of city life. To access the apartments visitors and residents enter the building from the street side, where a large sculptural staircase leads them up to the main reception lobby, which is located towards the rear and elevated above the two retail levels. From here they can continue to further lobby areas furnished with informal seating, where the elevators to the apartments are also located."

Photo: Hufton + Crow and Eva Bloem.

"The apartments in Le Toison d’Or vary in size from small to large, enabling a varied demographic of city residents. To ensure high levels of daylight in the interiors, the floor to ceiling heights reach at least 2.7 meters in living areas."

Photo: Hufton + Crow and Eva Bloem.

"For the apartments situated along the Avenue de la Toison d’Or, this height increases to more than 3 meters. Open kitchens in the form of large furniture elements create an informal entertaining space in the heart of the apartments and determine the circulation through the spaces."

Photo: Hufton + Crow and Eva Bloem.

"Le Toison d’Or has been developed with high standards of sustainability. Main features are the excellent thermic isolation of the façade (including triple glazing), a high standard of acoustic insulation, an inventive cogeneration installation system for both the apartments and the retail units and the use of glass-fiber reinforced concrete."

Photo: Hufton + Crow and Eva Bloem.

Project details:

Le Toison d’Or, Brussels, Belgium, 2009 - 2016
Client: TD Immo Invest BVBA, Brussels
Location: Avenue de la Toison d’Or25-29, Brussels
Building surface: 48000 m2
Building volume: 87000 m3 (above ground), 110.000 m3 (underground); total 197.000 m3
Building site: 5800 m2
Programme: Retail, apartments and underground parking
Status: Completed

More project images in the gallery below.

All images courtesy of UNStudio.

Share

  • Follow

    0 Comments

  • Comment as :

Archinect JobsArchinect Jobs

The Archinect Job Board attracts the world's top architectural design talents.

VIEW ALL JOBS POST A JOB

Interior Designer, 5+ Years Experience

Cass Calder Smith

Interior Designer, 5+ Years Experience

San Francisco, CA, US

Architectural Project Manager - Multifamily

DAHLIN ARCHITECTURE | PLANNING | INTERIORS

Architectural Project Manager - Multifamily

Irvine, CA, US

Project Architect

jones | haydu

Project Architect

San Francisco, CA, US

Project Manager

Trimble Architecture

Project Manager

New York, NY, US

Intermediate Designer - 3+ Years Experience (NY)

Cass Calder Smith

Intermediate Designer - 3+ Years Experience (NY)

New York, NY, US

Intermediate Architect

NDKazalas Architecture PC

Intermediate Architect

New York, NY, US

Intermediate Architect

FAME Architecture & Interior Design

Intermediate Architect

Los Angeles, CA, US

Project Designer / Job Captain

Solutions Architecture Corp

Project Designer / Job Captain

Verona, NJ, US

High-End Single-Family Residential Project Designer (6-8 years experience)

LUNO Design Studio

High-End Single-Family Residential Project Designer (6-8 years experience)

Los Angeles, CA, US

Senior Architectural Project Manager (Systems Driven, Human-Centric) (Hourly)

Local Parti Architecture, PC

Senior Architectural Project Manager (Systems Driven, Human-Centric) (Hourly)

New York, NY, US

Next page » Loading