• Login / Join
  • About
  • •
  • Contact
  • •
  • Advertising
bustler logo
bustler logo
  • News
  • Competitions
  • Events
  • Bustler is powered by Archinect
  • Sign up for Bustler's Email Newsletters

  • Follow these Bustler feeds:

  • Search

    Search in

  • Submit

    What are you submitting?

    News Pitch
    Competition
    Event
  • Login / Join
  • News|Competitions|Events
  • Search
    | Submit
    | Follow
  • Search in

    What are you submitting?

    News Pitch
    Competition
    Event

    Follow these Bustler feeds:

  • About|Contact|Advertising
  • Login / Join

Kaohsiung Port Terminal by Reiser + Umemoto

By Bustler Editors|

Monday, Dec 13, 2010

View from land

Last Friday, Reiser + Umemoto, in collaboration with Fei and Cheng and Associates (Taipei), Ysrael A. Seinuk, PC (New York) and Arup (Hong Kong), were announced First Prize winners in the Kaohsiung Port and Cruise Service Center International Competition. Today, the architects also sent us first images and a description of their winning project.

This new development will be located in the city of Kaohsiung in southern Taiwan, ROC.

Project Description:

For the Kaohsiung Port Terminal, we propose a dynamic 3-dimensional urbanism that takes advantage of the site’s unique lateral positioning with respect to the city grid.  Existing public pedestrian flows along the proposed elevated boardwalk can be amplified, rather than interrupted by creating a continuous elevated public esplanade along the waterfront. Cruise and ferry functions, meanwhile, are located just below the public level and are kept distinct to maintain secure areas for departing/arriving passengers.

View from water

The Main Hall splits up into three different partitions, each related to a different itinerary for travelling by ship, while the concourses are oriented parallel to the waterfront to maximize the interface between water and land.  By vertically separating the functions of the general public, port business, and travelers along this waterfront edge we are able to keep the various operational uses highly efficient while at the same time allowing for the synergy of mixed functions for the general public.

Model perspective

Vertical circulation is organized around thickened zones in the building’s skin which also house structure, utilities, and ventilation. The structure is a system of nested, long-span shells, which are composed of an underlying steel pipe space frame which is sandwiched by cladding panels to create a useable cavity space.  Overall an experience of directed yet funactionally separated flows will lend an aura of energy to the point terminal space.

Model elevation

An essential component to the vitality of the Port Terminal Project is the connection to a proposed elevated public space along the waters’ edge. The importance of this waterfront space which is distinct yet connected to the city of Kaohsiung is inestimable.

Model lit

The boardwalk links the new Pop Music Center, the arts and shopping districts within a green necklace along the waterfront. The boardwalk will be a 24 hour space that fosters shopping, dining, and recreation. Moreover, connection to this vital public conduit will ensure the continuous economic viability of the port terminal, sustaining and amplifying the periodic maritime uses of the cruise terminal and ferries.

Model boardwalk

The project is scheduled for construction in 2012 and expected to be in operation by 2014, with a construction budget of approximately $85,000,000 USD.  The competition is sponsored by the Kaohsiung Harbor Bureau, Ministry of Transportation and Communications, Taiwan, ROC.

Section longitudinal
Site Plan
Main level plan - cruise departures
G+3 level plan

All images courtesy Reiser + Umemoto.

Related

taiwan ● sea ● reiser + umemoto ● port terminal ● port ● kaohsiung ● asia

Share

  • Follow

    0 Comments

  • Comment as :

Kaohsiung Port Terminal by Reiser + Umemoto

Best in urban planning recognized at AIA Regional & Urban Design Award 2026

Sponsored Post by Buildner

Re:Form - New Life for Old Spaces / Edition #3 advance registration deadline is approaching!

New architecture and design competitions: IDEAS Awards, UIA-HYP CUP International Student Competition, Vancouver Tall Challenge, and Memorial to the Sixth Extinction

Best small projects chosen at AIA Small Project Award 2026

10 standout sustainable projects honored at AIA COTE Top Ten Award 2026

Best residential architecture of 2026 honored at AIA Housing Award

Best new interiors of 2026 chosen at AIA Interior Architecture Awards

Best global architecture honored at RIBA International Awards 2026

Sign up for Bustler's Email Newsletters

World’s most beautiful airports of 2026 chosen by Prix Versailles

New architecture and design competitions: Brick in Architecture Awards, Study Architecture Student Showcase, N.Y.C. Groceries, and New York High Falls Riverfront Market

SmithGroup’s ‘pioneering’ Philip Merrill Environmental Center wins AIA Twenty-five Year Award

Sponsored Post by Buildner

Museum of Emotions / Edition #8 FINAL registration deadline is in 5 DAYS!

Here are the winners of the 2026 AIA Architecture Awards

40 emerging architects and designers under 40 from Europe honored

Northwestern University selects 12-firm longlist to design new engineering building

Next page » Loading

Kaohsiung Port Terminal by Reiser + Umemoto

By Bustler Editors|

Monday, Dec 13, 2010

Share

View from land

Related

taiwan ● sea ● reiser + umemoto ● port terminal ● port ● kaohsiung ● asia

Last Friday, Reiser + Umemoto, in collaboration with Fei and Cheng and Associates (Taipei), Ysrael A. Seinuk, PC (New York) and Arup (Hong Kong), were announced First Prize winners in the Kaohsiung Port and Cruise Service Center International Competition. Today, the architects also sent us first images and a description of their winning project.

This new development will be located in the city of Kaohsiung in southern Taiwan, ROC.

Project Description:

For the Kaohsiung Port Terminal, we propose a dynamic 3-dimensional urbanism that takes advantage of the site’s unique lateral positioning with respect to the city grid.  Existing public pedestrian flows along the proposed elevated boardwalk can be amplified, rather than interrupted by creating a continuous elevated public esplanade along the waterfront. Cruise and ferry functions, meanwhile, are located just below the public level and are kept distinct to maintain secure areas for departing/arriving passengers.

View from water

The Main Hall splits up into three different partitions, each related to a different itinerary for travelling by ship, while the concourses are oriented parallel to the waterfront to maximize the interface between water and land.  By vertically separating the functions of the general public, port business, and travelers along this waterfront edge we are able to keep the various operational uses highly efficient while at the same time allowing for the synergy of mixed functions for the general public.

Model perspective

Vertical circulation is organized around thickened zones in the building’s skin which also house structure, utilities, and ventilation. The structure is a system of nested, long-span shells, which are composed of an underlying steel pipe space frame which is sandwiched by cladding panels to create a useable cavity space.  Overall an experience of directed yet funactionally separated flows will lend an aura of energy to the point terminal space.

Model elevation

An essential component to the vitality of the Port Terminal Project is the connection to a proposed elevated public space along the waters’ edge. The importance of this waterfront space which is distinct yet connected to the city of Kaohsiung is inestimable.

Model lit

The boardwalk links the new Pop Music Center, the arts and shopping districts within a green necklace along the waterfront. The boardwalk will be a 24 hour space that fosters shopping, dining, and recreation. Moreover, connection to this vital public conduit will ensure the continuous economic viability of the port terminal, sustaining and amplifying the periodic maritime uses of the cruise terminal and ferries.

Model boardwalk

The project is scheduled for construction in 2012 and expected to be in operation by 2014, with a construction budget of approximately $85,000,000 USD.  The competition is sponsored by the Kaohsiung Harbor Bureau, Ministry of Transportation and Communications, Taiwan, ROC.

Section longitudinal
Site Plan
Main level plan - cruise departures
G+3 level plan

All images courtesy Reiser + Umemoto.

Share

  • Follow

    0 Comments

  • Comment as :

Archinect JobsArchinect Jobs

The Archinect Job Board attracts the world's top architectural design talents.

VIEW ALL JOBS POST A JOB

Architecture & Design Manager

7th Street Burger

Architecture & Design Manager

New York, NY, US

Intermediate Architect

O'Neill Rose Architects

Intermediate Architect

Brooklyn, NY, US

Architectural Project Manager - Residential

DAHLIN Architecture | Planning | Interiors

Architectural Project Manager - Residential

Pleasanton, CA, US

Project Architect

Pickard Architects

Project Architect

Whittier, CA, US

Design Technologist / BIM Lead

The American Housing Corporation

Design Technologist / BIM Lead

Austin, TX, US

Hospitality Project Architect

bonetti/kozerski architecture DPC

Hospitality Project Architect

New York, NY, US

Architectural team Memeber

Meraki Architects, LLC

Architectural team Memeber

Middleburg Heights, OH, US

Marketing & Business Development Manager

KPB Architects

Marketing & Business Development Manager

Anchorage, AK, US

Interior Architect / Interior Designer

Annum Architects, Inc.

Interior Architect / Interior Designer

Boston, MA, US

Assistant Professor Architecture

California State Polytechnic University, Pomona

Assistant Professor Architecture

Pomona, CA, US

Next page » Loading