• Login / Join
  • About
  • •
  • Contact
  • •
  • Advertising
bustler logo
bustler logo
  • News
  • Competitions
  • Events
  • Bustler is powered by Archinect
  • Sign up for Bustler's Email Newsletters

  • Follow these Bustler feeds:

  • Search

    Search in

  • Submit

    What are you submitting?

    News Pitch
    Competition
    Event
  • Login / Join
  • News|Competitions|Events
  • Search
    | Submit
    | Follow
  • Search in

    What are you submitting?

    News Pitch
    Competition
    Event

    Follow these Bustler feeds:

  • About|Contact|Advertising
  • Login / Join

Hsinta Ecological Power Plant Construction Project Conceptual Design International Competition

Register/Submit Deadline:  Friday, Jan 5, 20185:30 PMHKT

Origin
To realize the Administration's "2025 Nuclear-Free Home" policy, changes must be made to current distribution of electricity generation, including boosting the percentage of green energy and gas combined cycle generation. Meanwhile, supplementary measures for energy-related R&D and stable power source must also be proposed to meet this goal. To this end, green energy, natural gas and nuclear-free home must be tackled in a holistic way. In addition to developing green energy, another way to boost power supply is to update existing electricity generation units. The government will accelerate the completion of Natural Gas Terminal No. 3 and increase the ratio of natural gas in fuel mix. This move, as a critical supplementary measure of "Stable nuclear energy reduction en route to nuclear-free home", will not only mitigate air pollution but also buy time to develop green electricity generation options. The government's goal is to establish an energy supply system that is low-emission, sustainable, high quality, stable, efficient and cost-effective. Aside from achieving nuclear-free home in 2025, the ratio of renewable energy in the power supply equation must also reach 20%. The continuous addition of power from renewable energy feeding into the grid is an unstoppable trend. To address the overall need of Taiwan's electricity supply system and environmental issues such as CO2 reduction, natural gas will only increase in importance in the energy mix.

The "Hsinta Power Plant Natural Gas Units Replacement Plan" (hereinafter as the "Hsinta Plan") has been developed with multiple objectives in mind. It aims to address imminent decommissioning of existing power generation facilities and growing demand in long-term electricity capacity, enhance the overall performance and competitiveness of the supply system and reduce CO2 emission and pollution. According to the plan, existing natural gas units No. 1 through to No. 5 at Hsinta Power Plant, which are expected to be decommissioned around 2023~2025, are to be replaced with gas combined-cycle units with a total installed capacity of 3.9GW. The goal is to start commercial operation of the first replaced unit in July 2023 and to obtain utility license and start commercial operation of all units by January 2026.

Brief of Project Content
Hsinta Power Plant is located at No. 6, Hsinta Rd., Yongan District, Kaohsiung City. The Plant is currently divided into two sites. The primary electricity generation equipment is located at Plant Area No. 1, while Plant Area No. 2 encompasses salt fields TPC purchased from TAIYEN in 1986. Plant No. 1 occupies an area of 147.8 hectares at the intersection of Yongan and Qieding districts in Kaohsiung City. Located in Yantian Borough, Yongan District, it is flanked by Hsinta Fishing Harbor to the north and Taiwan Strait to the west. The site is surrounded by Taiwan Strait, fish farms and fishing harbor and both its northbound and southbound accesses depend solely on Provincial Highway No. 17 to the east. Plant No. 2 (the competition site, hereinafter as the "Project Site" is to the southeast of Plant No. 1. At 130 hectares, it is bound by Yanbao Rd. (Lane 7, Yongda Rd.) to the south, Hsinta Rd. to the west and, to the east, Zhuzaigang Channel (a public watercourse) linking to a lagoon. The south side of the site encompasses Yongan Salt Field Wetland. A 41.25-hectare area in the southern end of Yongan Salt Field was designated as a locally important wetland in a reassessment conducted during the fourth session (July 21, 2017) of 2017 meetings by the "Ministry of the Interior Important Wetland Review Committee". The Committee concluded that the area boasts rich ecological features and strong potential in environmental education. There is also a 1.3-hectare office building for the former Wushulin Salt Manufacturing Company within the extent of the wetland. Rich in historical significance and worthy of conservation, it was designated by Kaohsiung City Government as a municipal historical architecture on May 21, 2008.

The building form and landscape design of a power plant must also take into consideration the spatial and functional needs of a power generating facility, which tend to hinder innovation. In the planning of Hsinta Ecological Power Plant as a brand-new facility, TPC hopes to introduce innovative design and ideas and attract reputable design teams around the world while establishing a green corporate image. By undertaking its building form and landscape planning through an international conceptual design competition, thus shaping the vision and image for the future plant, TPC hopes to realize breakthrough concepts for the next-generation power plant--one that aligns itself with leading global standards to become a local landmark. The image embodied by the new plant will also serve to promote TPC's corporate philosophy, help the public better identify with power plants in the country and enhance the corporate image through promotional activities. The result of the competition will serve to inform the plant's future design and construction, toward making the final product the pride of all local residents.

Type of Competition

Two-stage, conceptual, open competition.

Qualification
 ●Any licensed architect (or architect firm) of Taiwan (R.O.C.) or any licensed architect (or architect firm), licensed landscape architect (or landscape architect firm) of foreign country, alone or in teams.
●Any design-related company of Taiwan (R.O.C.) or foreign country, alone or in teams.
●Any student recommended by design-related school/department of university of Taiwan (R.O.C.) or foreign country, alone or in teams.

The participant(company and student) registered in Mainland China (including Macau) is not qualified to participate in this competition.

Required Documents for Registration:
(A) Registration From: 1 copy.
(B) Copies of Qualification Documents (The contents should be the same as the original. Please refer to the documents required as set forth in article 4.3 of this document.)
Delivery Method:
Please visit web site at: www. EcoPP.com.tw/register
Then, select “Upload”, and fill in the online registration form to upload registration documents. (Please do not duplicate registration. After uploaded successfully, please send a registration notice Email to [email protected], the Host Organization will reply Email to confirm)

Registration Acceptance Period:
Starting from the announcement date to 17:30 of Jan. 5th, 2018 Taiwan Time, all of the participants are entitled to apply for the registration. (Please register as early as possible) Subject to the time registered by the registration desk. The application submitted after the deadline shall not be accepted.

Proposal Documents Accepting Location and Deadline: 

Stage One:

Please send the Proposal Documents before 17:30 of January 23rd, 2018. (Taiwan time) Subject to the time registered by the registration desk; otherwise, the participant shall be disqualified.

A. Upload Files

Please upload the Proposal Documents files mentioned in article 7.1.1~7.1.3 before deadline to: www.ecopp.com.tw/proposal (Please do not duplicate uploading. Please send a notice Email to [email protected] after successful uploading. The host organization will reply Email to confirm.)

B. By Mail or Hand Deliver:

Before the deadline, please mail or hand delivers the materials to: 7F., No.669-3, Dajin St., Nantun Dist., Taichung City 40848, Taiwan (R.O.C.)

Please note the following on the envelope: “Project Office of Hsinta Ecological Power Plant Construction Project Conceptual Design International Competition”

Office Hours: Monday through Friday, 9:00 to 17:30 (Office will be closed for national holidays.) Tel: 886-4-23261799

Stage Two:

Participant shall pack and seal the Proposal Documents in accordance with the requirements of Competition Documents and carry the materials to the presentation location and hand in to the TPC before scheduled presentation time for each Shortlist Participant.

Winners and Awards

Stage One:
Five Shortlists: NT$ 200,000 for each (Approximately US$ 6,600) (Awarded the right to enter into Stage Two)
Five Honorable Mentions: NT$ 100,000 for each (Approximately US$ 3,300)
Ten Selected Awards: Certificate of Award

Stage Two:
One First Prize: NT$ 4,000,000(Approximately US$ 130,000)
One Second Prize: NT$ 2,000,000(Approximately US$ 66,000)
One Third Prize: NT$ 1,000,000(Approximately US$ 33,000)
Two Merit Awards: NT$ 500,000(Approximately US$ 16,000) for each

For more information, please visit: www.ecopp.com.tw

Barry Cheng Architect
Mobil: 886-937-213454 TEL: 886-4-2326-1799 FAX: 886-4-2326-5212
Email: [email protected]

Share

  • Follow

    0 Comments

  • Comment as :

Hsinta Ecological Power Plant Construction Project Conceptual Design International Competition

Register/Submit: Fri, Jan 5, 2018

Mass Timber Innovation and Design Center of Canada - Call for Entries

Register/Submit: Sun, Jun 21, 2026

Open Access: Exploring 130 Years of American Design

Register/Submit: Sun, Jun 28, 2026

2026 Taipei Design Award

Register/Submit: Tue, Jun 30, 2026

SMALL PROJECT BIG IMPACT

Register/Submit: Tue, Jun 30, 2026

CCC Emerging Design Awards 2026

Register/Submit: Tue, Jun 30, 2026

N.Y.C. Groceries Branding and Design RFP

Register/Submit: Tue, Jun 30, 2026

Call for nominations: Tamayouz Women in Architecture and Construction Award 2026

Register: Wed, Jul 1, 2026

Submit: Fri, Jul 31, 2026

Re:Form - New Life for Old Spaces / Edition #3

Register: Thu, Jul 2, 2026

Submit: Mon, Oct 12, 2026

Sign up for Bustler's Email Newsletters

AR House awards 2026

Register/Submit: Fri, Jul 3, 2026

Envision Resilience National Design Studio Grant

Register/Submit: Fri, Jul 3, 2026

Study Architecture Student Showcase 2026

Register/Submit: Mon, Jul 6, 2026

Portugal Long Table Restaurant

Register: Wed, Jul 8, 2026

Submit: Mon, Jan 11, 2027

100,000 € Prize / Buildner's Unbuilt Award 2026

Register: Thu, Jul 9, 2026

Submit: Tue, Oct 20, 2026

UltraTech IndiaNext Design Competition - Sustainable Futures

Register: Fri, Jul 10, 2026

Submit: Wed, Jul 15, 2026

Coastal Shelter Architecture Competition (Outer Banks, USA)

Register/Submit: Fri, Jul 10, 2026

Next page » Loading

Hsinta Ecological Power Plant Construction Project Conceptual Design International Competition

Register/Submit Deadline:  Friday, Jan 5, 20185:30 PMHKT

Share

Related

taiwan ● asia ● green energy ● sustainability ● power plant

Origin
To realize the Administration's "2025 Nuclear-Free Home" policy, changes must be made to current distribution of electricity generation, including boosting the percentage of green energy and gas combined cycle generation. Meanwhile, supplementary measures for energy-related R&D and stable power source must also be proposed to meet this goal. To this end, green energy, natural gas and nuclear-free home must be tackled in a holistic way. In addition to developing green energy, another way to boost power supply is to update existing electricity generation units. The government will accelerate the completion of Natural Gas Terminal No. 3 and increase the ratio of natural gas in fuel mix. This move, as a critical supplementary measure of "Stable nuclear energy reduction en route to nuclear-free home", will not only mitigate air pollution but also buy time to develop green electricity generation options. The government's goal is to establish an energy supply system that is low-emission, sustainable, high quality, stable, efficient and cost-effective. Aside from achieving nuclear-free home in 2025, the ratio of renewable energy in the power supply equation must also reach 20%. The continuous addition of power from renewable energy feeding into the grid is an unstoppable trend. To address the overall need of Taiwan's electricity supply system and environmental issues such as CO2 reduction, natural gas will only increase in importance in the energy mix.

The "Hsinta Power Plant Natural Gas Units Replacement Plan" (hereinafter as the "Hsinta Plan") has been developed with multiple objectives in mind. It aims to address imminent decommissioning of existing power generation facilities and growing demand in long-term electricity capacity, enhance the overall performance and competitiveness of the supply system and reduce CO2 emission and pollution. According to the plan, existing natural gas units No. 1 through to No. 5 at Hsinta Power Plant, which are expected to be decommissioned around 2023~2025, are to be replaced with gas combined-cycle units with a total installed capacity of 3.9GW. The goal is to start commercial operation of the first replaced unit in July 2023 and to obtain utility license and start commercial operation of all units by January 2026.

Brief of Project Content
Hsinta Power Plant is located at No. 6, Hsinta Rd., Yongan District, Kaohsiung City. The Plant is currently divided into two sites. The primary electricity generation equipment is located at Plant Area No. 1, while Plant Area No. 2 encompasses salt fields TPC purchased from TAIYEN in 1986. Plant No. 1 occupies an area of 147.8 hectares at the intersection of Yongan and Qieding districts in Kaohsiung City. Located in Yantian Borough, Yongan District, it is flanked by Hsinta Fishing Harbor to the north and Taiwan Strait to the west. The site is surrounded by Taiwan Strait, fish farms and fishing harbor and both its northbound and southbound accesses depend solely on Provincial Highway No. 17 to the east. Plant No. 2 (the competition site, hereinafter as the "Project Site" is to the southeast of Plant No. 1. At 130 hectares, it is bound by Yanbao Rd. (Lane 7, Yongda Rd.) to the south, Hsinta Rd. to the west and, to the east, Zhuzaigang Channel (a public watercourse) linking to a lagoon. The south side of the site encompasses Yongan Salt Field Wetland. A 41.25-hectare area in the southern end of Yongan Salt Field was designated as a locally important wetland in a reassessment conducted during the fourth session (July 21, 2017) of 2017 meetings by the "Ministry of the Interior Important Wetland Review Committee". The Committee concluded that the area boasts rich ecological features and strong potential in environmental education. There is also a 1.3-hectare office building for the former Wushulin Salt Manufacturing Company within the extent of the wetland. Rich in historical significance and worthy of conservation, it was designated by Kaohsiung City Government as a municipal historical architecture on May 21, 2008.

The building form and landscape design of a power plant must also take into consideration the spatial and functional needs of a power generating facility, which tend to hinder innovation. In the planning of Hsinta Ecological Power Plant as a brand-new facility, TPC hopes to introduce innovative design and ideas and attract reputable design teams around the world while establishing a green corporate image. By undertaking its building form and landscape planning through an international conceptual design competition, thus shaping the vision and image for the future plant, TPC hopes to realize breakthrough concepts for the next-generation power plant--one that aligns itself with leading global standards to become a local landmark. The image embodied by the new plant will also serve to promote TPC's corporate philosophy, help the public better identify with power plants in the country and enhance the corporate image through promotional activities. The result of the competition will serve to inform the plant's future design and construction, toward making the final product the pride of all local residents.

Type of Competition

Two-stage, conceptual, open competition.

Qualification
 ●Any licensed architect (or architect firm) of Taiwan (R.O.C.) or any licensed architect (or architect firm), licensed landscape architect (or landscape architect firm) of foreign country, alone or in teams.
●Any design-related company of Taiwan (R.O.C.) or foreign country, alone or in teams.
●Any student recommended by design-related school/department of university of Taiwan (R.O.C.) or foreign country, alone or in teams.

The participant(company and student) registered in Mainland China (including Macau) is not qualified to participate in this competition.

Required Documents for Registration:
(A) Registration From: 1 copy.
(B) Copies of Qualification Documents (The contents should be the same as the original. Please refer to the documents required as set forth in article 4.3 of this document.)
Delivery Method:
Please visit web site at: www. EcoPP.com.tw/register
Then, select “Upload”, and fill in the online registration form to upload registration documents. (Please do not duplicate registration. After uploaded successfully, please send a registration notice Email to [email protected], the Host Organization will reply Email to confirm)

Registration Acceptance Period:
Starting from the announcement date to 17:30 of Jan. 5th, 2018 Taiwan Time, all of the participants are entitled to apply for the registration. (Please register as early as possible) Subject to the time registered by the registration desk. The application submitted after the deadline shall not be accepted.

Proposal Documents Accepting Location and Deadline: 

Stage One:

Please send the Proposal Documents before 17:30 of January 23rd, 2018. (Taiwan time) Subject to the time registered by the registration desk; otherwise, the participant shall be disqualified.

A. Upload Files

Please upload the Proposal Documents files mentioned in article 7.1.1~7.1.3 before deadline to: www.ecopp.com.tw/proposal (Please do not duplicate uploading. Please send a notice Email to [email protected] after successful uploading. The host organization will reply Email to confirm.)

B. By Mail or Hand Deliver:

Before the deadline, please mail or hand delivers the materials to: 7F., No.669-3, Dajin St., Nantun Dist., Taichung City 40848, Taiwan (R.O.C.)

Please note the following on the envelope: “Project Office of Hsinta Ecological Power Plant Construction Project Conceptual Design International Competition”

Office Hours: Monday through Friday, 9:00 to 17:30 (Office will be closed for national holidays.) Tel: 886-4-23261799

Stage Two:

Participant shall pack and seal the Proposal Documents in accordance with the requirements of Competition Documents and carry the materials to the presentation location and hand in to the TPC before scheduled presentation time for each Shortlist Participant.

Winners and Awards

Stage One:
Five Shortlists: NT$ 200,000 for each (Approximately US$ 6,600) (Awarded the right to enter into Stage Two)
Five Honorable Mentions: NT$ 100,000 for each (Approximately US$ 3,300)
Ten Selected Awards: Certificate of Award

Stage Two:
One First Prize: NT$ 4,000,000(Approximately US$ 130,000)
One Second Prize: NT$ 2,000,000(Approximately US$ 66,000)
One Third Prize: NT$ 1,000,000(Approximately US$ 33,000)
Two Merit Awards: NT$ 500,000(Approximately US$ 16,000) for each

For more information, please visit: www.ecopp.com.tw

Barry Cheng Architect
Mobil: 886-937-213454 TEL: 886-4-2326-1799 FAX: 886-4-2326-5212
Email: [email protected]

Share

  • Follow

    0 Comments

  • Comment as :

Promoted Competitions

50,000€ Prize / Mujassam Watan Urban Sculpture Challenge #8

Register by Thu, Jul 23, 2026

Submit by Thu, Aug 27, 2026

Museum of Emotions / Edition #8

Register by Thu, Jun 18, 2026

Submit by Mon, Jul 20, 2026

Portugal Long Table Restaurant

Register by Wed, Jul 8, 2026

Submit by Mon, Jan 11, 2027

Underbridge / Edition #2

Register by Thu, Jul 16, 2026

Submit by Mon, Oct 19, 2026

Re:Form - New Life for Old Spaces / Edition #3

Register by Thu, Jul 2, 2026

Submit by Mon, Oct 12, 2026

Vancouver Tall Challenge

Register by Wed, Jul 15, 2026

Submit by Mon, Nov 30, 2026

100,000 € Prize / Buildner's Unbuilt Award 2026

Register by Thu, Jul 9, 2026

Submit by Tue, Oct 20, 2026

Valli Wine Tasting Room

Register by Thu, Jul 30, 2026

Submit by Mon, Feb 15, 2027

Pavilion Atlas 2026

Register by Wed, Sep 16, 2026

Submit by Mon, Oct 19, 2026

Kinderspace: Architecture for Children's Development competition / Edition #4

Register by Thu, Aug 27, 2026

Submit by Mon, Nov 30, 2026

Kingspan MICROHOME 2026

Register by Wed, Sep 30, 2026

Submit by Mon, Nov 2, 2026

2026 Fall 2x8 Exhibition and Scholarship Program

Register by Mon, Sep 14, 2026

Submit by Mon, Oct 19, 2026

Next page » Loading