International Bidding of Architectural SD for Overall Renovation of Shenzhen Working People’s Cultural Palace
Registration Deadline: Friday, Feb 7, 20205 PMHKT
Submission Deadline: Friday, Feb 14, 20205 PMHKT
Related
In response to the work plan of the municipal Party committee and the municipal government, based on the functional positioning and future development demands of Shenzhen Working People’s Cultural Palace, the International Bidding of Architectural SD for Overall Renovation of Shenzhen Working People’s Cultural Palace is officially launched. It is hosted by Shenzhen Federation of Trade Unions and Luohu District Government, Shenzhen and organized by Shenzhen Metro Group Co., Ltd., in a bid to seek the most creative proposal from all over the world.
Project Profile
Shenzhen Working People’s Cultural Palace (Shenzhen Staff Service Center) (“the Cultural Palace”) is a public welfare institution affiliated to Shenzhen Federation of Trade Unions. It was built in 1953 in the name of Bao’an County Worker’s Cultural Palace. It is located in the core area of Luohu District adjacent to Dongmen Commercial Pedestrian Street, a key section covered by Guangzhou-Shenzhen Intercity Railway. On the south of the Cultural Palace, there is a metro station for interchange between three metro lines, serving as a citywide passenger transport hub. The main function of the Cultural Palace is to offer culture, art and vocational training and accommodate recreational and sports activities for the working people. It is a front of Shenzhen Federation of Trade Unions to serve and a bridge linking closely with the working people.
With the rapid development of the city, the existing building of the Cultural Palace can no longer keep up with people’s increasing demands for recreational and sports activities. This makes it extremely urgent to renovate and upgrading the building. The new Cultural Palace will be a complex cultural landmark integrating culture, art, and public and supporting services. It will promote the upgrading and transformation of Dongmen Commercial Circle and create a fashion art center with regional influence in the future.
Work Content
The Project neighbors People’s Park on the north, Shen Nan Da Dao on the south, the Guesthouse and Dongmen Commercial Circle on the east, and Buji River on the west. It enjoys prominent location and pleasant natural environment. The site area of the Project is nearly 60,000m2, while its existing GFA is about 26,900m2.
The bidding will involve three stages: prequalification, schematic design, and bid finalization. Stage 1 (prequalification) involves urban design research and architectural conceptual design. The scope of urban design research covers the Cultural Palace, the Guesthouse, Dongmen Commercial Circle, Buji River and the residential district on the west of Buji River (see Fig. 1 for the scope of urban design research and Design Brief for the specific site scope).
Registration Requirements
1 Domestic and international design firms are welcome to register for the Design Competition.
2 Design firms need to provide the enterprise registration certificate and design license or relevant documents with the same effects.
3 Design firms with the same principal or with holding or management relationship shall not register for the competition simultaneously.
4 Consortium bid is acceptable (regardless of border), but bid submitted by an individual or a team of individuals is not acceptable.
5 Members of consortium applicants should meet the following requirements:
a. Each consortium should have no more than three members, and no member is allowed to register twice for the competition in the name of another firm or another consortium.
b. The members should sign a legally effective Consortium Agreement, and specify the leading party, the division of work between the members in each design stage, the proportion and way of distribution of the design cost, etc.
6 The applicants should undertake to set up a project team with a fixed office in Shenzhen after winning the bid. The project team should be composed of a project principal and various disciplinary principals, who should cooperate with each other to complete the design work in each stage as required by the contract until the termination of the contract.
7 The applicants should assign a person who has directed design projects of the same type as the chief designer of the Project. The chief designer must take charge of the main design work of the Project and attend important presentation meetings required by the Host. If the chief designer’s profile is found to be inconsistent with the one submitted for prequalification, the Host is entitled to disqualify the bidder involved from being shortlisted and winning the bid, and hold such bidder responsible for corresponding legal liabilities.
WORK RULES
The bidding is open to all design firms worldwide. Bidders will be required to submit corresponding registration document and design proposal pursuant to the Bidding Rules and the Design Brief. Fifteen bidders will be selected through prequalification to participate in subsequent schematic design.
Stage 1 Prequalification
Dec. 17, 2019: Release of official announcement
Before 17:00 p.m., Feb. 7, 2020: Registration on https://szdesigncenter.jinshuju.com/f/DKxz8J.
Before 17:00 p.m.,Feb. 14, 2020(TBD): Registration on the Transaction Platform and submission of prequalification documents in hardcopy and USB flash disc (registration document and design proposal). Deadline for registration.
Feb.20, 2020(TBD): Review of prequalification documents by the Prequalification Committee, which will select 15 bidders to proceed to subsequent stage.
Feb.28, 2020(TBD): Announcement of prequalification results and distribution of Shortlist Notice
Stage 2 Schematic Design
Mar. 30, 2020(TBD): Distribution of Bidding Document
Apr. 2, 2020(TBD): Site visit and Q&A
Apr. 12, 2020(TBD): Deadline for questions in written form
Apr. 30, 2020(TBD): Clarification, Amendment and Answering Period deadline
Before 15:00 p.m., Jun. 10, 2020(TBD): Submission of design submissions (The place of submission is subject to further notice)
Jun. 11, 2020(TBD): Proposal evaluation meeting, where three winning proposals will be determined (without ranking)
Stage 3 Bid finalization
Jun. 30, 2020(TBD): Bid finalization and release of result
Notes: All the time and dates are shown in Beijing Time. The Host reserves the right to adjust the schedule. Subject to announcement at Shenzhen Construction Project Transaction Service Net.
Prizes
Referring to the Charging Standards for Engineering Survey and Design (2002 Revision) jointly formulated by the State Development Planning Commission and the Ministry of Construction, and the Announcement on the Preliminary Plan for Overall Renovation of Shenzhen Working People’s Cultural Palace (Shen Fa Gai [2019] No. 248) issued by the Development and Reform Commission of Shenzhen Municipality, the SD fee of the Project is tentatively determined at about RMB 22 million yuan, while the construction content, size, standard, total investment and design cost shall be subject to the project approval documents.
COMPENSATION
1st place (one winner): the 1st place will win the bid and obtain the design contract.
2nd place (two winners): each will receive Two Million Yuan (¥2,000,000.00) as stipend.
Other shortlisted bidders (12): each will receive Eight Hundred Thousand Yuan (¥800,000.00) as stipend.
ORGANIZERS
Host: Shenzhen Federation of Trade Unions & Luohu District Government, Shenzhen
Organizer: Shenzhen Metro Group Co., Ltd.
Co-organizer: Shenzhen Center for Design (Shenzhen Center for Public Art) & Shenzhen Renzhihui Business Consulting Co., Ltd.
Bidding agent: Shenzhen Dongsen Construction Project Management Co., Ltd
Contact person: Ms. Xu, 0755-83243435
Email: [email protected]
For details, please visit www.szdesigncenter.org
Share
0 Comments
Comment as :